Someday, we will have a central heating system (perhaps solar, geothermal, or a wood pellet boiler) that feeds hot water to the barn, house and any other buildings we have by then. But that 'someday' is a long time from today, and it is getting cold outside. So I bought a electric micro boiler and related plumbing to put together a heating system for our in-floor hydronics. Midway through the assembly process, my workspace looked like this:

I clamped all the plumbing components to a board that was screwed to the wall of the utility closet, directly over the stub-outs of the in-floor hydronic tubes. I also added two branch lines to feed the upper floor bedrooms and bathroom this winter.

The system was fired up yesterday (surprisingly, leak-free!) and is slowly pumping heat into the cold concrete floor...
No comments:
Post a Comment