Friday, April 15, 2011
Moving on...
Friday, March 11, 2011
The Stairmaster.
After removing them from the forms, I realized that I hadn't placed my uprights as accurately as I should've and the railing was pretty 'wavy'...another lesson learned on the stairmaster of life. Considerable reworking ensued, and I was able to get it trued up reasonably well, or at least good enough for a barn. I epoxied the two sections together, then painted the railing white to cover all my mistakes. I installed it with wrought iron balusters, tightly spaced to meet the latest code requirements (either babies are getting smaller, or their parents are becoming less attentive...). Voila!

Monday, February 28, 2011
A country kitchen.

Open shelving made from pine slabs:
An induction cooktop, which so far has been great to cook on:
I hid the microwave under the countertop:

As well as the garbage/recycling bins and Asko dishwasher, which have panelized doors:


Sunday, February 20, 2011
Running on the sun.
Tuesday, February 08, 2011
Disentanglement.
Then I built removable soffits and a chaseway to cover it all, which looks like this:

Admittedly, the wood soffits wound up being quite heavy, but can be removed if necessary without destroying anything.
Monday, January 24, 2011
Embellishments
We purchased a natural mattress from OMI for the slab wood bed, and topped it with organic 


I made night stands from salvaged lumber and antique sewing machine bases. The lamps (made from wagon wheel hubs) were found in an antique store and seemed appropriate for the barn:

My mom donated a really nice antique dresser as well:

Thursday, January 13, 2011
Solar Sundays Part IX- Finishing up
I sealed the top edge openings with Tyvek tape, and the bottom edge with a vapor-permeable tape supplied by Farmtek. Next, the perimeter was lined with adhesive-backed gasket strips.
Back outside, I put the glazing panels up and covered the seams with cedar trim boards...as you can see, it has been a snowy winter so far.
The finished solar array:
The 'closet' at the far left end of the array houses the supply & return plumbing and wiring before it goes underground:
The hot fluid exits the solar array at the top and connects to the 1" pex line below. The tee fitting at the top left leads to a schraeder valve for purging air from the high point of the system. The two valved tees midway down the closet are for a summer bypass loop- this is yet to be completed, but will likely lead to a heat exchanger in an outdoor shower system I'd like to build.
The return water enters the array bottom right. Since I separated the 9-panel array into two 'banks', there are two separate supply lines. The two stubbed lines in the middle are for a spring/fall diverting loop which will dump excess heat into our garden beds to preheat the soil- this will be connected later. The diversion is controlled by the 3-way diverter valve at the first tee.
Inside the barn, I installed addition plumbing and controls to tie the solar system in to the existing hydronic system. My dad said it looks like "an organized Rube Goldberg project" and I can't really argue with that. I have managed to fit a 3-zone hydronic system, boiler and the solar hot water controls in about 4 square feet of floorspace...not bad. And it is actually quite simple- The solar heated fluid enters the barn through a pump (the pump is activated by a snap switch inside the first solar collector via a single-zone relay). The pump will send the hot fluid through the in-slab hydronic loops (2- 300 ft lengths of 7/8" pex tubing embedded in the concrete floor) then back to the collectors. Should the slab get too warm (say, spring and fall when not much heat is required), a thermocouple in the slab will signal an aquastat to switch a pair of 3-way diverter valves, thus bypassing the slab and sending the hot fluid to the diversion loop instead. The first diverter valve is located middle left in the photo below and the other in the closet at the collector array. Finally, the two stubbed lines at the top left are to send the hot fluid through a yet-to-be-installed DHW preheat tank. The photo below was taken as I charged the system with glycol, so the temp hoses and bucket-o-glycol are shown as well. Again, there are a lot of dangling wires since the controls for the diversion system are not yet connected, but you get the idea.
Here is a shot from inside the utility room (actually just a 2 foot deep closet). The existing hydronic system is on the facing wall, and the solar branch controls are on the left wall.
Saturday, January 08, 2011
Eccorok'd all over again.


I "wet" polished the vanity using diamond sanding pads and a small amount of water from a spray bottle- just enough to keep the surface wet, but not so much as to make a mess in the barn. Then it was coated with the same Ecotuff Clear Coat used for the countertops. I used smaller pieces of Eccorok (randomly cut from larger squares that I cast along with the vanity), to make my own backsplash tiles. Here's the install:
I'm done with Eccorok for awhile.
Wednesday, December 29, 2010
Drain water heat recovery.
Before testing it out, I insulated all of the drain plumbing between the sink, shower and the DWHR pipe. Before...
Here is the vertical transition going into the chaseway:
I noticed most of the water noise was coming from the vertical transitions, so I insulated this area with XPS foam board and copious amounts of spray foam- not pretty, but it really cut down the noise and will contain the heat very well.
Today, I ran hot water through the shower to see how the DWHR would perform- results look good! With the shower running at 101F, the incoming cold well water was being 'preheated' from an initial 50F temp up to about 72F, capturing 44% of the otherwise down-the-drain heat! The manufacturer claims up to 57% efficiency is possible with this model, but that figure is based on a drain water flow rate of 5gpm- much higher than our low-flow sink and shower will ever provide. I'm guessing that around 40% is to be expected and is still very good. And the best part- the DWHR unit was virtually free- our electrical utility provider offered a $400 rebate for installing this $500 system, so the payback should be less than one year. Even at full price, this appears to be a very wise investment and a great energy conservation project. I'd be curious to hear what results others are having with the DWHR units.Friday, December 24, 2010
The final steps on the yellow brick road.
Since the bricks were laid with tight joints, I wasn't sure exactly how to go about the grouting process. Having absolutely zero experience with tile work at the time didn't help- so I decided to leave it 'as is' and come back to it later...that was 2008! Finally, almost two years later, I vacuumed all the debris out of the cracks (which amounted to over 3 gallons of sawdust and wood chips), and got started. I mixed some home brew grout using 2.5 parts sand to 1 part Portland cement- then with my mom's help we worked the powder it into the cracks using an experimental sweeping, rubbing and putty knife-packing technique. This worked relatively well, albeit very messy.
Working in sections, the dry grout was packed into the joint lines, then the excess was vacuumed off the top of the bricks and gently wiped clean with sponges. Once the bricks were fairly clean, I sprayed water over the dry mix using an HPLV sprayer to start the hydration process. We worked from one end to the other in this manner, taking an entire day to do the pathway.
I gave the pathway a few more sprayings of water over the next few days, letting the grout set up. Then it required about a dozen moppings to remove the haze of grout that was all over the rough-textured surface (I had put two coats of AFM Mexeseal on the bricks before starting the grouting process, but it didn't seem to help that much). After alot of scrubbing, here's the nearly finished product:
The grout was VERY slow to harden using this method, and required some touch up in certain places where there didn't seem to be enough Portland in the mix for it to set. I changed the sand/Portland ratio to 2:1 for the touch up work and this seemed to be much better...more lessons learned on the rocky road of barn-building.