Keith came back with his skidsteer and a couple of guys to finish the foundation work. After excavating down to the bottom of the slab, draintile was put in around the entire perimeter. Multi-tasking: We kept working on the roof while they were digging below.

Perimeter insulation was installed over the draintile, then covered with dirt. This will keep the foundation warm and dry year round....

Since all the backfill for the foundation work has been taken from the field nearby, a there was a big hole to fill back in. Thanks, Keith for doing it with your Bobcat- that saved me about 2 weeks of nonstop shoveling!

Saturday, August 25, 2007

Big Timber

Just as we started sheathing the silo, Glen came over with his boom and a trailer FULL of beams for the floor joists of the barn. They were freshly milled and very heavy (300 lbs each, until they dry out), so thankfully he stuck around for a few hours to set them in place with the crane. The 4X10 beams look great, and are about as 'sustainable' as you can get- they were all milled from locally-harvested blowdowns. No trees were killed for this project! Glen also left me with a pile of thick slabs that will be used to make tables, benches, countertops, etc. Okay, back to the silo..

Thursday, August 09, 2007

Ahhh, the smell of concrete at dawn.... It was like the moments leading up to a big race: Stayed up late going over last minute details. Couldn't sleep, as I worried all night about how tomorrow would turn out. Get up at 4:30am with butterflies in my stomach. Head outside at dawn to do a few final prep tasks and clear the area around the slab. Keith and crew showed up around 6:30am and the first of two cement truck pulled in at 7am. The mud starts flowing shortly thereafter. I tried to help out as much as possible, but was mostly just staying out of their way since the guys have this process pretty well choreographed from years of experience. I was praying that the pathway form didn't break and that the hydronic system held pressure during the pour. Everything went well and by 9am we had a foundation. A couple of the guys stayed until lunchtime to trowel the slab smooth while I removed the spreaders from the pathway form so they could get inside and work. Nice job, guys!

Wednesday, August 08, 2007

Read my mind.

"Stand back ladies, I've got this COMPLETELY under control." or, "Do we really need in-floor heat?" or, "Has anyone seen the other end of this tubing?" or, "This stopped being fun about 4 days ago..." What I was really thinking was, "Good thing I have Lisa and Tammy here to help figure this out!" Thanks to them, we laid down 600 feet of 7/8" PEX tubing throughout the slab in just a few short hours. Sliding it under the pathway form was a little tricky, but it worked out okay. (Photo by Claire Schotzko) I spent the rest of the day zip-tying the PEX to the rebar and making sure everything was kosher since we will be pouring concrete in the morning! I also connected the PEX to the distribution manifold (where all the strands are bunched up in lower right corner) and pressurized the system to 50psi to check for leaks. It held pressure all night, so that was a relief.

Tuesday, August 07, 2007

Reinforcements.

The pathway form now occupying a large portion of the slab made the remaining tasks difficult- I had to figure out how to provide continuous reinforcement across the building in both directions, and the PEX tubing needed to be put down over and around it. For reinforcement, I used #4 rebar in an 18" grid pattern. Keith borrowed one of his rebar benders so that I could shape the pieces to drop down under the pathway form wherever needed. I could've spanned the whole barn with a single piece of rebar, if I were talented enough to put the required 4 bends in precisely the right spots to curl under and back out of the pathway recess- impossible! So I cut each piece of rebar in half and lapped the joints under the pathway. Working around the pathway form made an otherwise easy task become another dawn-till-dark affair. But eventually my stubborn persistence won out and the grid pattern was done.

Now for the PEX tubing....

Sunday, August 05, 2007

This may not be the easiest way...

...but it was the only way I could think of to build the form for the brick pathway. First, I used some of the FSC lumber purchased for the wall framing (yes, someday I hope to actually put up walls!) to make 20 ft long temporary 'joists'. These were rested on the perimeter of the foundation form, spaced apart about 18" or so. I then attached strips of scrap plywood vertically down from the joists and resting on the foundation bed, following the desired outline of the pathway. Next I ripped more of that Masonite siding (the same stuff used to build the silo form) into 3" strips and attached them to the verticals to make the rounded edge for the pathway. The Masonite wants to break when bent into a tight radius, so I had to make hundreds of shallow kerf cuts in it wherever a sharp corner was made. This took some experimentation, but it worked out okay. Once it was shaped just right, I installed 'spreaders' across the inside to hold everything together (I was able to use old barn board scraps for this), then removed those joists to reveal the pathway form. Voila- all this took another couple of days to fabricate. The lengths I will go to just to salvage the old barn bricks!

Tuesday, July 31, 2007

Visions.

I have a vision. Not some heat-induced hallucination, but rather something that I came up with months ago while sitting in the house watching the snowflakes fall. The vision had to do with a 'circle theme' in the barn. It started with the idea of building an attached silo. Then it seemed like a great idea to install a curving pathway of bricks in the floor that would guide you through the building. Then, I wanted to incorporate curves into other architectural details like an arched roof, curved walls and countertops, etc. Very cool indeed. However, now I actually have to build these things that I've concocted in my head, and each un-straight element is going to present a new challenge. The current (and possibly most difficult) one is the brick pathway. I started by pounding in some reference stakes and tracing out the pathway in the compacted sand layer that I worked so hard to create. After a few changes to the shape, it looked pretty good, so I started digging (again!). After all that time spent putting dirt into the barn, now I'm shoveling it back out. Don't ask. But only a small amount had to be removed to provide a thickened slab under where the brick pathway would follow. After removing about 3" of fill from this area, I compacted everything one more time and it was DONE.

With Lisa's help, a layer of poly was put over the entire area to provide the vapor barrier once the slab is poured. You can vaguely see the outline of the pathway under the plastic, and next I will have to build special forms to contain the pathway while the slab is poured....

Monday, July 30, 2007

Heat acclimatization training.

Its hot. Really hot! But i'm not complaining, because there are no bugs, no rain, and I've got a nice sandy beach to cool off in anytime. However, temps in the 90s do slow progress somewhat, and it doesn't seem like getting up early helps much. As soon as you start shoveling, you also start sweating! With the silo formed up, the next task was to put in the last formboard for the barn wall and install the remaining insulation. Then the extra gravel that Keith piled up in and around the area was shoveled in... ...and then compacted.

Sunday, July 29, 2007

Rectangles are for Squares...

Okay, now things started getting a little more tricky. The attached faux silo that I decided to build with the barn requires its own round section of concrete foundation, and it needs to be accurately formed so that the cylindrical silo walls will fit properly when the framing begins. So I started by building a 10 foot diameter disc by cutting, then gluing and screwing together radiused sections of plywood. It only took 2 sheets of plywood (green treated plywood for the bottom surface that would be in contact with the concrete, and standard plywood for the other) to build the whole thing. This will eventually be used as the sillplate for the wall framing, but for now it will act as the jig for getting the concrete forms built to the correct size. Shown below is the sillplate disc placed on the leveled silo site. After checking, double-checking, and then checking all my measurements again (and I'm still hoping I have calculated everything properly!), I pounded in stakes every 16" around the perimeter. After the stakes were trued up and braced, I attached pieces of Masonite siding which bend nicely to form the circle. I also had to form a short 'entryway' section of wall to connect the silo to the main barn.

Finally, I attached 2 layers of 1" thick extruded polystyrene insulation to the inside of the masonite, plus a base of 2" insulation to the floor, and taped all seams with Tyvek tape.

While this all looks pretty straightforward now, it actually took me a day and half just to complete the silo form!

Thursday, July 26, 2007

Keith came back out with a couple of guys and we leveled the site, installed foamboard insulation, and started backfilling with more sand/gravel. A rainstorm forced an early quitting time, but Keith piled up enough extra gravel nearby so that I could finish the job the old fashioned way on my own- with a shovel.

Wednesday, July 25, 2007

After a few days of digging trenches and laying pipe, I finished all the necessary under-slab drain plumbing (the white pipes), as well as the electrical service entrance (the gray pipe) and the water supply (black pipes). The top photo shows the Thermopex (insulated hydronic dual-PEX tubing) that was extended about 30 feet out from the barn, to eventually be connected to a central water storage heating system (this is part of the "master plan" to heat all buildings from one highly-efficient heat source). The bottom left photo is the main floor bathroom and utility room area, and in the bottom right photo you can see the drain line that will come from the master bathroom in the upper floor of the barn's silo. Today I covered all these lines with backfill. Keith is expected to return tomorrow so that we can reset the form boards and level out the site before the insulation is put down. Even though it is 90+ degrees outside, I want to celebrate by going out for a bike ride!

Like a kid again.

Back when I was 4 years old, all I needed was a pile of dirt and my arsenal of Tonka trucks to keep me in a perpetual state of bliss. After several birthday parties, I had acquired a pretty respectable fleet of kid-sized excavating equipment. The bulk of the earthmoving jobs were done with my front end loader, dumptruck, and the bulldozer- my pride-and-joy (I think I slept with it at night!). I must've pushed that dozer a thousand miles, converting seemingly useless piles of dirt into butter-smooth 14" wide super-highways. NOTHING else mattered. Three decades and 8 years of higher education later, here I am back in the sandbox. The work is a little harder. The weather feels alot harsher. And ironically, even though I'm building a house, a dream, and a future, it all seems less significant than it did 30 years ago. Funny.

Friday, July 20, 2007

Here we go...

Keith came over with his skidsteer the day after I got the permit and we removed the concrete footings from the old barn. It only took a couple of hours. The next day, he returned with his crew of 4 guys to level the site and put up the formboards. Now its up to me to install all the under-slab utilities (plumbing, electrical, hydronics) before they can return to finish the forming. Finally some progress! -shawn