Sunday, February 20, 2011
Running on the sun.
Tuesday, February 08, 2011
Disentanglement.
Then I built removable soffits and a chaseway to cover it all, which looks like this:

Admittedly, the wood soffits wound up being quite heavy, but can be removed if necessary without destroying anything.
Wednesday, December 29, 2010
Drain water heat recovery.
Before testing it out, I insulated all of the drain plumbing between the sink, shower and the DWHR pipe. Before...
Here is the vertical transition going into the chaseway:
I noticed most of the water noise was coming from the vertical transitions, so I insulated this area with XPS foam board and copious amounts of spray foam- not pretty, but it really cut down the noise and will contain the heat very well.
Today, I ran hot water through the shower to see how the DWHR would perform- results look good! With the shower running at 101F, the incoming cold well water was being 'preheated' from an initial 50F temp up to about 72F, capturing 44% of the otherwise down-the-drain heat! The manufacturer claims up to 57% efficiency is possible with this model, but that figure is based on a drain water flow rate of 5gpm- much higher than our low-flow sink and shower will ever provide. I'm guessing that around 40% is to be expected and is still very good. And the best part- the DWHR unit was virtually free- our electrical utility provider offered a $400 rebate for installing this $500 system, so the payback should be less than one year. Even at full price, this appears to be a very wise investment and a great energy conservation project. I'd be curious to hear what results others are having with the DWHR units.Monday, March 15, 2010
Solar Sundays- Part I
Basically, I started by making a 4X8 'box of 2x6 lumber and a plywood bottom.
Then I added 1.5" of polyiso insulation over the plywood.
Next, I soldered together the copper piping that will carry water through the collector- basically 1/2" 'risers' connected to 3/4" manifolds, with an inlet on one end and outlet in the opposite corner. This copper is the expensive part of the project, but I managed to get a pile of tubing for less than scrap prices off Craigslist about a month ago! The photo shows the copper assembly as I was pressure testing it prior to the next step.
To make the 'fins', I took my leftover aluminum heat transfer plates (these are the ones I was using for the in-wall hydronic system installed in the bedrooms recently) and expanded them to 7/8" dia using a pipe, a simple wooden jig, and several blows from a sledgehammer. Good exercise.
The fins were then clamped around the tubing using some special vice grip clamps made by a friend of ours for this project. With the clamps forcing the aluminum fins tightly around the copper, I put in several screws through to the plywood base to hold everything in place. This system seemed to work very well once I got the hang of it.
Here's a close-up of the fins installed over the tubing.
Then I gave the assembly a coat of black paint.
and finally cut a piece of twinwall polycarbonate for glazing (this is the same stuff I used for our raised bed garden covers). Other than trim pieces over the glazing, it is basically done...next weekend I'll work on the pump and controls.....
Saturday, March 13, 2010
Zone 3 and the heat is on!
Schluter Ditra (the orange colored uncoupling membrane) was mortared over the subfloor assembly, and then our local slate cleftstone was mortared over the Ditra. By nature, this slate is not perfectly flat like manufactured tiles, so there was some resulting variability in the pieces. I did my best to maintain smooth transitions from stone to stone.
After setting the stones, I put down the last few planks in the entryway, scribing the final board to fit the curve of the stones.
The stones still need to be cleaned, sealed and grouted once the mortar has fully cured, but you get the idea.
In the boiler room, I connected the lines for the bedroom and bathroom hydronic loops and installed electronic zone valves so they can be regulated separately from the in-slab heat. I also extended the supply and return branches that will run outside to the solar thermal panels we'll be installing this summer. Everything went back together and I fired the system back up this morning without any leaks. The barn is now fully heated and solar-ready!
Sunday, December 13, 2009
Zone 2- the hydronic wall.
Then I built a "hydronic sandwich" using aluminum heat transfer plates between 'sleepers' of 3/4" foil-faced isocyanurate insulation.
Finally, ready for drywall, which is screwed into the studs being VERY CAREFUL not to puncture the tubing runs....
The aluminum plates help conduct the heat out of the pex tubing and into the drywall surface. The insulation 'sleepers' act as spacers between the drywall and studs, and help direct the heat out outward to the room. The drywall surface readily conducts the heat and radiates it outward to the room. By using this method rather than the more tradition underfloor hydronic installation, more BTUs can be delivered to the room at lower water temps...and it was a much easier and less expensive method in this case. The obvious downside to this method is the risk of puncturing the tubing with fasteners. I took a lot of pictures of the assembly and documented the pex locations so if we ever need to hang a picture on the wall, I'll know where not to pound a nail! Thursday, January 15, 2009
Hot water.
Once the lid is put on, a single 3500W electric heating element extends down the center of the coil to heat the tank water. We also purchased a heat pump retrofit kit (www.airgenerate.com), which will be installed in the spring so that we can heat the water more efficiently and use the exhaust air for home cooling...more on that later. Since the tank is not pressurized, I can also modify it to accept solar heated water when we get to that phase in the future.
We paid $350 for the heater- a little more than buying a conventional tanked electric heater, but a great price for the benefits of this design.
Friday, December 05, 2008
Ventilation.
Here is the unit hanging from the ceiling in the utility closet. I connected some temporary ductwork through the wall, just to get the fresh air into the main area of the barn.
The HRV works by means of a counterflow heat exchanger, which maximizes the transfer of heat from the stale exhaust air to the fresh supply air from outside. With claims of 92% efficiency, it seemed to defy the laws of thermodynamics in my mind, so I was skeptical at first. But it works great! Inside the unit, the outgoing air flows one direction and the incoming air flows the opposite direction, so that the coolest outgoing air just barely warms the cold incoming air, and the warmest outgoing air warms the already-sorta-warm incoming air. By arranging the airflows in this way, the incoming air captures nearly all of the heat from the outgoing air before it leaves the house. Of course, I had to put a thermometer in the fresh air duct to see how well it was doing- On a day when the outside temp was around 10F, and the building was at 58F, the fresh incoming air was being 'preheated' to about 53 degrees. At this rate, the HRV will pay for itself in no time!Sunday, November 16, 2008
Heat on!
I clamped all the plumbing components to a board that was screwed to the wall of the utility closet, directly over the stub-outs of the in-floor hydronic tubes. I also added two branch lines to feed the upper floor bedrooms and bathroom this winter.
The system was fired up yesterday (surprisingly, leak-free!) and is slowly pumping heat into the cold concrete floor...
Monday, August 04, 2008
More adventures in silo-building.
My dad came over and helped rig up the scaffolding around the silo exterior so I could prepare it for the stucco. Thanks to Keith borrowing me some of his scaffolding, we were able to circle the entire silo and tie everything together solid. I have been dreading this job all winter, but with the scaffolding so rigid, it is actually pleasant to be working up high now. The original layer of XPS foam was covered with Tyvek Stuccowrap, windows flashed (again), and then covered with 1" EPS foamboard, screwed through both layers and into the studs.


