Almost airtight.

Because the barn was too tight to produce accurate readings when they were here the first time, Minnesota Power returned to complete the air infiltration testing with a more precise blower door assembly- the results were as good as we could've hoped for. The magic number measured in this test is referred to as CFM50, which represent the amount of air leaking through all the gaps in the building when it is under a negative pressure of 50 pascals. The smaller the number, the better. Most houses today, being of older stock built before we knew much about air sealing, are very leaky, so CFM50 values of 1.0 or larger are common. A "Code" house built today should be .50 or less. To meet the minimum Energy Star requirements, we needed to be .25 or better. The more stringent Energy Star Tier III requirement is .15 or better. To satisfy the even stricter PassiveHaus standards (arguably the most stringent energy-efficient building standards on the planet), the barn's CFM50 would need to be under .08. That said, I was thrilled when our building measured .05 in this test- one of the tightest buildings they have ever measured...we did it! Since the CFM50 value represents the air infiltration per square foot of building size (in other words, the barn was .05 cubic feet per minute airflow per square foot at 50 Pascals pressure), it can then be converted to the ACH50 (Air Changes per Hour) number, which takes into account the total size of the building. This number represents how often the air is exchanged through the building due to uncontrolled leakage. Obviously, when you are trying to conserve precious heated air in our brutally-cold winter climate, the lower the number the better. the ACH50 value for the barn was 0.4, so we bettered the PassivHaus requirement of 0.6 ACH by 33%. This is exponentially better than many of the older homes in this area, and a substantial improvement over even the well-built new homes today. So what does all this math mean? Minimal heating system requirements, low heating costs, and a comfortable indoor environment...we'll take it.

Wednesday, August 20, 2008

Judgement Day.

In addition to the LEED certification program, we also enrolled our project in the Triple E Construction/Energy Star program through our utility provider Minnesota Power. This program rewards energy efficient construction techniques by verifying the thermal performance of the house and awarding cash rebates when certain levels are achieved. To verify the energy efficiency of the barn, a blower-door test was conducted. This procedure consists of sealing off the doorway with an expandable frame and fan assembly that depressurizes the building by blowing air out of the house. As the building is depressurized, air will rush in through the various "leaks" in the walls, penetrations, windows, etc. Sensors on the blower unit measure the amount of airflow required to achieve a given pressure level- the "tighter" the house, the lower the flow. While the blower door test was running, I got to walk around with the thermal imaging camera, which displays the temperature variation in the surfaces of the building. If any air was finding its way into the house, it would show up as a "hotspot" on the camera. Pretty slick tool! I have been anxiously awaiting this test for months, and can now say the results were even better than I had hoped for. The little white barn was super tight- the air infiltration was so low that we could not get an accurate reading with the blower door test! He will need to come back to retest it with a more precise blower setup before we can know for sure, but for now it looks like we may be building the most energy efficient "barn" in the world...and a rebate check is on the way (finally, greenbuilding pays!).

Tuesday, August 12, 2008

Who needs technology?

We were preparing to start the insulation when we realized that our 2-way radios were not working. Okay, we thought we could do this without radios. Shawn was on the second story of the barn and I was outside on ground level. The first day, we tried the shouting method. With the blower running, we could not hear each other. So, then I would either turn off the blower and shout to see if he was finished or I would walk into the barn, up the ladder and ask "Are you done yet?". This got to be a tad bit tedious. Luckily the first day we had a room for error. If I didn't turn the blower off in time, the cellulous would just go to another area that needed to be filled. On the second day, we were getting to the end of each "pocket". There wasn't much room for error. I guess the worst that could happen would be that there would be cellulose everywhere. We went looking for a battery for the 2-way radios. Couldn't find one. Shawn had a great idea of using a string. He would pull it when he was finished. I was worried that if I was doing something like loading the blower, I wouldn't see it move. So, I added an accessory and it worked beautifully! My family goes to the state fair every year and plays the "frog game". Every year we get stuffed frogs that hang around the house. So, I have finally found a good use for our frog. After a hard days work, Frog now has a place of honor in the barn. He is the Green gate official mascot. Really, who needs 2-way radios?

Monday, August 11, 2008

Super-insulated? Definitely.

The trusses were filled with 10+ inches of Icynene spray foam last winter, giving the barn an airtight seal and exceeding code requirements for insulation levels. But there was still plenty of space left in the trusses to go the extra yard with insulation, so we decided to do just that.

First, I stapled up some Insulweb netting to the bottom cord of the trusses, which will contain the insulation before drywall is installed. Then I screwed a double layer of 3/8" plywood strips in place to give the segmented trusses a smooth, radiused contour for the drywall to attach to.

With the prep work done, I cleverly convinced Lisa that being in the driver's seat of an insulation blowing machine would be "fun", and we filled the trusses with Greenfiber cellulose insulation.

Lisa kept the hopper filled and I worked the receiving end of the hose- after 2 days of "fun" and about $500 in materials (less than some people's monthly heating bill in this part of the country), we had packed 1600lbs of recycled newspaper into the ceiling. This puts the R-value of the ceiling at R50 (near the bottom of the trusses) to over R100 (at the peak).

Thursday, January 10, 2008

While the foundation and framing have already received a skin of XPS, i've spent dozens and dozens of hours debating how to insulate the barn's interior framing. Early on, I had leaned towards blown-in cellulose for its high recycled content, thermal performance and reasonable cost. However, I was concerned with it settling over time, unless I hired a contractor who could dense-pack it. But dense-packed cellulose in the deep roof trusses required a huge amount of material, which would be very heavy and very expensive. So I got more excited with the idea of spray-foam insulation, and eventually decided to go with Icynene for a variety of reasons- namely, its contribution toward energy-efficient sustainable design. Plus, I found a very sharp and eco-conscious local contractor who made me feel confident about hiring out the work. Never mind the high price tag- it is money well invested when it provides a healthy, energy-efficient home for the rest of our lives. So before the hired help arrived, I had to frame in a roof in the upper level of the silo. I made a 2X6 roof, covered it above with OSB and strapped it below with perpendicular 2X4 framing. This would allow for 9" of insulation with minimal thermal bridging. Plus, the access door and decking above would give me future access to the domed silo roof from the inside. The foam guys came the next day and sprayed the milkhouse roof, barn roof and silo roof (they'll have to come back to spray the walls once i've done all the electrical wiring). It was nice to see them so concerned with doing the job well, no matter how long it takes (and it took about 10 hours just to do the roofs!). Fiberglass should be outlawed...