Keith came back out with a couple of guys and we leveled the site, installed foamboard insulation, and started backfilling with more sand/gravel. A rainstorm forced an early quitting time, but Keith piled up enough extra gravel nearby so that I could finish the job the old fashioned way on my own- with a shovel.
No comments:
Post a Comment